Site icon Ships & Ports

Angola charters LNG ship to Nigeria

Angola’s new liquefied natural gas (LNG) export project aims to charter out its entire tanker fleet for at least a couple of months after a major rupture on a flare line crippled output at the $10 billion plant last month.

The project partners led by U.S. oil major Chevron have approached shipbrokers to charter out all seven LNG carriers dedicated to Angola’s liquefaction facility, according to media reports.

One of the tankers has already been chartered to a shipper and is due to load a cargo in Nigeria soon while the other ships are currently being discussed.

Last month’s rupture of a flare line at Angola LNG was the latest in a string of production setbacks since the plant started production in June 2013.

Operator Chevron has struggled with electrical fires, rig capsizes, pipelines leaks and operator errors at the site.

It remains uncertain for how long the plant will remain out of service as engineers take stock of the outstanding technical challenges before repairs can begin, sources at the site said.

The unexpected addition of so much new shipping capacity is pressuring already weak rental rates.

LNG shipping rates have been declining for months due to an oversupply of ships as well as a sharp reduction in Atlantic-Pacific trade flows because of weak demand in Asia.

Chevron has a 36.4 percent share in the Angolan plant, while Angolan state oil firm Sonangol has 22.8 percent. Other stakeholders include Total, BP and ENI.



Copyright Ships & Ports Ltd. Permission to use quotations from this article is granted subject to appropriate credit given to www.shipsandports.com.ng as the source.

Exit mobile version