Maersk Drilling orders first 20,000 PSI blow out preventers

Maersk Drilling is ordering the world’s first 20,000 PSI-rated blow out preventers from GE Oil and Gas.

These giant stacks of milled steel, heavy-duty piping and finely tuned electro-hydraulic equipment will be deployed on board a pair of purpose-built 20k psi drilling rigs that will be delivered at the end of 2018.

These rigs will be used as part of an agreement to support BP’s Project 20K, a joint study that aims to unlock the vast oil reserves within the Paleogene, or Lower Tertiary zones – an area that BP holds a strong position in.

The difficulty with the Paleogene is that it’s very deep and at a very high temperature which limits the recoverable resources to about 10 percent of the reservoir.

In a study it carried out, Wood Mackenzie estimates that a two percentage point increase in recovery from a typical Paleogene field would add USD $1 billion of value to the field.



Copyright Ships & Ports Ltd. Permission to use quotations from this article is granted subject to appropriate credit given to www.shipsandports.com.ng as the source.