The Panama Canal Authority (ACP) announced a second draught restriction for the Canal due to drought caused by the El Niño phenomenon.
Effective 29 April the maximum authorised transit draught will be set at 11.74 m (38.5 ft) tropical fresh water.
Vessels loaded to draughts over 11.74 m (38.5 ft) on or before April 1, 2016, will have this draught restriction waived for transit, subject to safety considerations. Vessels loaded after 1 April 2016 will have to comply with the draught restriction. Draught restrictions will be implemented in 15 cm (six-inch) decrements at a time, with each restriction announced at least four weeks in advance.
ACP said it would continue to monitor and manage the water levels. And eliminate these draught restrictions as soon as Gatun Lake level returns to normal.
“As always, these are temporary and preventive measures to ensure the continuous and safe operations of the canal,” the ACP said, adding that it remained fully committed to responsible management of its water resources and the protection of the waterway.
Copyright Ships & Ports Ltd. Permission to use quotations from this article is granted subject to appropriate credit given to www.shipsandports.com.ng as the source.